• Factory Pneumatic Cut-off Valve & 6 Bank Solenoid Valve Manifold High Pressure Water Distributor Assembly For Sanitation Sprinkler Truck Water System
  • Factory Pneumatic Cut-off Valve & 6 Bank Solenoid Valve Manifold High Pressure Water Distributor Assembly For Sanitation Sprinkler Truck Water System
  • Factory Pneumatic Cut-off Valve & 6 Bank Solenoid Valve Manifold High Pressure Water Distributor Assembly For Sanitation Sprinkler Truck Water System
  • Factory Pneumatic Cut-off Valve & 6 Bank Solenoid Valve Manifold High Pressure Water Distributor Assembly For Sanitation Sprinkler Truck Water System
  • Factory Pneumatic Cut-off Valve & 6 Bank Solenoid Valve Manifold High Pressure Water Distributor Assembly For Sanitation Sprinkler Truck Water System
  • Factory Pneumatic Cut-off Valve & 6 Bank Solenoid Valve Manifold High Pressure Water Distributor Assembly For Sanitation Sprinkler Truck Water System
  • Factory Pneumatic Cut-off Valve & 6 Bank Solenoid Valve Manifold High Pressure Water Distributor Assembly For Sanitation Sprinkler Truck Water System
  • Factory Pneumatic Cut-off Valve & 6 Bank Solenoid Valve Manifold High Pressure Water Distributor Assembly For Sanitation Sprinkler Truck Water System
  • Factory Pneumatic Cut-off Valve & 6 Bank Solenoid Valve Manifold High Pressure Water Distributor Assembly For Sanitation Sprinkler Truck Water System
  • video

Factory Pneumatic Cut-off Valve & 6 Bank Solenoid Valve Manifold High Pressure Water Distributor Assembly For Sanitation Sprinkler Truck Water System

  • US$48.24-436.4
Combine 6-way high-pressure water manifold and pneumatic cut-off valve into one assembly, realize centralized water circuit control for sanitation trucks, simplify vehicle piping layout, reduce pipeline leakage risk by over 60%;Compatible with sprinkler truck, road sweeper, washing truck, dust suppression vehicle, complete water distribution & switch control solution;Support long-time high-pressure water supply working condition, stable output for front flushing, side sprinkling, rear water cannon functions.

Factory Pneumatic Cut-off Valve & 6 Bank Solenoid Valve Manifold High Pressure Water Distributor Assembly For Sanitation Sprinkler Truck Water System


1

Product parameters

NamePneumatic shut-off valveSix-unit high-pressure water distribution valve assembly
NumberHG-YH-QDQDF1HG-YH-QDQDF2HG-YH-GYFSF3
Price$48.24 $84.04 $436.40 
Connection MethodInternal Thread Bolt57mmInternal Thread Bolt73mmDirect connection
SpecificationsDN50DN65Six-unit Integrated Pneumatic Water Separation Valve
Main materialstainless steelstainless steelaluminum alloy
long(mm)170195450
wide(mm)11514073
High(mm)7590160
Mass/Weight(g)1.49kg3kg9.04kg
Unitpiece
colorsilver


2

Structural Details

Pneumatic Cut-off Valve

Interface Specification

Adopts national standard female thread connection, DN50 matches 57mm internal thread standard, and the thread protective cap is engraved with 2.5-inch specification mark to avoid installation mismatch. 

Sanitation Truck Water System

Valve Block Material & Surface Treatment

The valve body adopts aviation-grade high-strength forged aluminum alloy with silver anodized anti-oxidation surface treatment. It is lightweight, high-hardness, rust-proof and resistant to electrochemical corrosion. 

6 Bank Solenoid Valve Manifold

Six-Way Independent Control Structure

Equipped with 6 groups of independent solenoid valve control units, each valve bank corresponds to an independent water outlet channel,and each channel can be opened and closed independently through pneumatic control.


3

Core Product Functions

Our Functions

Pneumatic Cut-off Valve

Master Water Circuit On-Off Control by Pneumatic Cut-off Valve

The Pneumatic Cut-off Valve undertakes the total switch control of the entire Sanitation Truck Water System.

Sanitation Truck Water System

Multi-Mode Water Distribution by 6 Bank Solenoid Valve Manifold

As the branch control core of theSanitation Truck Water System, the 6 Bank Solenoid Valve Manifold realizes independent switch control of six water channels.

6 Bank Solenoid Valve Manifold

System Pressure Stabilization & Pipeline Protection

The Pneumatic Cut-off Valve and 6 Bank Solenoid Valve Manifold work synergistically in the Sanitation Truck Water System.


4

Product Competitive Advantages

Pneumatic Cut-off Valve



Superior anti-corrosion construction extends overall service lifespan.

Our pneumatic cut-off valve is integrally forged from 304 stainless steel and performs steadily in the tough water systems of sanitation trucks, which are exposed to constant high humidity, dust and wastewater. It offers excellent rust and wear resistance.

Carefully engineered sealing structure prevents medium leakage.

All sealing components fitted on the pneumatic cut-off valve and 6-station solenoid valve manifold are made of imported highly elastic rubber, the assemblies stay leak-free even under prolonged high-pressure operation.



Sanitation Truck Water System





Modular Integrated Structure for Easy Installation & Maintenance

This integrated 6-station solenoid valve manifold cuts piping and wiring components by 40% compared with conventional split-type structures. Directional markings on the pneumatic cut-off valve help avoid installation errors.

Wide Compatibility and Low Failure Rate

Compatible with standard pneumatic control and power systems of mainstream sanitation vehicles. The pneumatic cut-off valve offers fast response, and the 6-station manifold ensures stable independent control of each channel.



5

Product Application Scenarios

           

          OEM & Assembly of Municipal Sanitation Vehicles:

  • The matchedPneumatic Cut-off Valve and 6 Bank Solenoid Valve Manifold are standard core accessories for factory assembly of sprinkler trucks, road sweepers, dust suppression trucks and sewer flushing trucks.

    Municipal Road & Public Sanitation Operation:

  • Widely used for municipal road cleaning, dust suppression, pavement flushing and green belt irrigation.The 6-station solenoid valve manifold enables flexible water distribution to satisfy various working demands of sanitation truck water systems.

    Aftermarket Replacement & System Renovation:

  • Suitable for old parts replacement and water system renovation of used sanitation vehicles. It can upgrade and optimize the traditional backwardSanitation Truck Water System, solve the problems of aging valve parts and unstable water control, and improve vehicle operation efficiency.

6 Bank Solenoid Valve Manifold


6

About Us

We are a professional manufacturer boasting more than 15 years of independent R&D experience. Equipped with modern large-scale production facilities. We mainly cater to overseas customers and can develop customized equipment solutions together with matching commercial service packages for buyers worldwide.

1.Strong Manufacturing Capacity

Our production workshop covers a complete range of processes, including metal rolling and forming, precision sheet metal cutting, automated robotic welding, special vehicle assembly and finished product inspection.Our mature assembly lines support mass production. We can accommodate large overseas orders and guarantee stable delivery arrangements for long-term distributors.

Pneumatic Cut-off Valve

2.Authorized Qualification & R&D Strength

Backed by 15+ years of R&D efforts, we own many invention and utility model patents. Ongoing independent technical improvements boost the durability and pressure resistance of our pneumatic control valves and complete aftermarket aluminum pneumatic valve spare parts. We hold comprehensive global compliance certifications such as CE and other industry qualifications.

Sanitation Truck Water System

3.Core Competitive Advantages

We offer an end-to-end "Design-Operation-Maintenance" service framework.We provide custom exterior painting design, warning marking arrangement and multilingual user manuals, helping buyers correctly install and maintain pneumatic control valves and tanker equipment for longer service life.

6 Bank Solenoid Valve Manifold

ls your company a factory or trading company?

We are a leading manufacturer of special trucks, tankers, trailers, and spare parts in China Welcome to visit us in Suizhou city, the production base of Chinese special purpose vehicles

What is your terms of payment?

T/T 30-50% as deposit, and the rest before delivery. We'll show you the photos of the products and packages before you pay the balance.

What is your terms of delivery?

EXW, FOB, CFR, CIF, DAF, DDU.

How about your delivery time?

Generally, it will take 20 to 30 days after receiving your advance payment. The specific deliver time depends on the items and the quantity of your order.

Can you customize the product according to my requirements?

Yes. We have professional R&D team, we can produce the product exactly according to your requirements.

What is the price of your product?

We are direct sales from the factory, so the price is very competitive. Different products have different prices. The price also depends on your special needs. To know the exact price, please contact us!

Do you test all your goods before delivery?

Yes, we have 100% test before delivery.

What service can l get from you?

We provide lifelong tracking service and one year free warranty for all of our products.Meanwhile we provide free training and technical support to quide you repair your product. lf you need, we will also supply original spare parts and you just need to pay the freight

Related Products

Get the latest price? We will reply as soon as possible (within 12 hours)